Payloads / Projects: Difference between revisions
Jump to navigation
Jump to search
Line 24: | Line 24: | ||
| [[LINK]] || || | | [[LINK]] || || | ||
|- | |- | ||
| [[BEEP]] || || | | [[BEEP]] || || || <span style="color:#04db33">'''INACTIVE'''</span> | ||
|} | |} | ||
Revision as of 13:56, 4 April 2023
WIP Payloads and Projects. Tricky to organize because most things will fall into multiple categories. Would also be ideal to indicate active vs. past payloads and some way to show # of flights.
Payloads and Projects
Payload | Description | Status |
---|---|---|
GHOUL (Gross Horrible Outrageous Ugly Leaking Payload) | Helium venter for floating | ACTIVE |
TUFF (Tension Under Flight Forces payload) | Drag and wind oscillation measurement | ACTIVE |
SLAPS (Solar Launched Automatic Power System) | Solar power collection for extended flights | ACTIVE |
RF and Tracking Payloads
Payload | Description | Status | |
---|---|---|---|
Command | Primary tracking payload | ACTIVE | |
LIVE | Live streaming | ACTIVE | |
LINK | |||
BEEP | INACTIVE |
Weather Monitoring
Payload | Description | Status |
---|---|---|
Tyrion | INACTIVE | |
Dany | INACTIVE | |
Bach's Box | INACTIVE |
Flight Extension and Termination
Payload | Description | Status |
---|---|---|
Choppy | Cutdown payload | ACTIVE |
HELIOS | Helium venter | INACTIVE |
CHARM | Cutdown payload | INACTIVE |
Reoccurring Program Payloads
Payload | Description | Status |
---|---|---|
Panoramic | 360° Camera payload | ACTIVE |
Turtle Nest | Payload for flying souvenirs | ACTIVE |
Ground Systems
Payload | Description | Status |
---|---|---|
ATLAS RES | ACTIVE |
Outreach Projects
Payload | Description | Status |
---|---|---|
BPP Stem Workshop 2023 | ACTIVE |